ADAA Case Studies

On this page you will find a link to each of the Case Studies published by the Association to date.

 

Each of these PDF documents requires Adobe Acrobat Reader. To download Adobe Acrobat Reader, please click here.

 

If you encounter any errors in accessing the documents on this page, please email the Administrator from the Guest Page and you will be posted a copy of all requested technical literature.

 

 

Case Study 8 - November 2006 - Seacliff Bridge

Case Studies - Download pdf

 

  • Introduction
  • Alliance
  • Durability
  • Concrete
  • Fly Ash
  • Consistency of Fly Ash Concrete
  • Summary Performance Results

Case Study 7 - May 1999 - Use of Fly Ash at Premier Mine Collie W.A

Case Studies - Download pdf

 

  • Introduction
  • History
  • Reasons for Use of Fly Ash
  • Results

 

Case Study 6 - November 1998 - Furnace Bottom Ash - The Engineer's Friend

Case Studies - Download pdf

 

  • Introduction
  • Uses for FBA
  • Eraring ROS Ash

 

Case Study 5 - November 1998 - Evolution in RTA Concrete Specifications & Influence on Pacific Highway Upgrading: A Chronological Review

Case Studies - Download pdf
  • Introduction
  • 15 December 1992
  • September 1994
  • October 1994
  • February 1997
  • Chiderah, May 1997
  • Sound Barriers
  • Concrete Culverts
  • Roads
  • Median Barriers
  • Other Bridgeworks

 

Case Study 4 - August 1997 - NSW Public Works Bathurst Sewerage Treatment Works

Case Studies - Download pdf

 

  • Introduction
  • Bathurst Sewerage Treatment Works
  • Drying Shrinkage of Ash Concrete
  • Onsite Comments
  • The Outcome

 

Case Study 3 - August 1997 - Fly Ash in Precast & Prestressed Concrete Structural Concrete Industries link with Boral Country

Case Studies - Download pdf

 

  • Introduction
  • Project participants
  • Fly ash
  • Portland Cement Concrete

 

Case Study 2 - May 1997 - Tallowa Dam Shoalhaven Scheme - Alkali Aggregate Reaction

Case Studies - Download pdf
  • Introduction
  • Details of Concrete
  • Permeability
  • Summary of Readings After 6 Months of Curing
  • Permeability Inflow Readings at 6 Months
  • Discussion
  • Significance of Low Permeability

 

Case Study 1 - May 1997 - Tallowa Dam - Shoalhaven Scheme - Concrete Permeability

Case Studies - Download pdf
  • Introduction
  • Details of Concrete
  • Permeability
  • Summary of Readings After 6 Months of Curing
  • Permeability Inflow Readings at 6 Months
  • Discussion
  • Significance of Low Permeability